ISABEL SEGUNDA BEACH HOUSE

The garage floor slab has been poured and the walls are being formed. The forms themselves are made from plywood and 2x4 lumber to allow 10' heights to be poured at one time. 8" walls are used to support the two floors above and to retain the earth that will be backfilled. The vacant concrete block building across the access road is not typically allowed on the beach, but it has been "grandfathered".