ISABEL SEGUNDA BEACH HOUSE

The steel for the 6" garage floor slab is almost ready for pouring concrete. The garage is entered from the water side of the house. This photo is taken from Peterson Street above. The excavation required removing approximately 300 cubic yards of dirt.